Garden-fresh finds · Free shipping over $65 · Browse the beds

84-01: EPRI Research on Cooling Tower Performance Fills a transit time sonic flow

SKU: 94480773839

4.8
USD20.00 USD58.00

Pay in 4 interest-free payments of $5.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 19 - Aug 24

Description

a transit time sonic flow meter and a dyedilution technique

This provides important information regarding the fate of the material in the system as well as the suitability of the biocide feed protocol selected

The first phase of testing did not use pretreatment for this highly contaminated wastewater

It is well known that phosphorus-based corrosion inhibitors cause fouling with calcium if they are not adequately treated with a stabilizing product to prevent foulant precipitation

This paper will discuss the corrosion protection methodology for concrete as it relates to cooling tower structures

84-01: EPRI Research on Cooling Tower Performance Fills a transit time sonic flowOne of the primary goals of EPRI's Heat Waste and Water Management Program is to improve the ability of the utility industry to predict and test the performance of power plant cooling systems. The object of this work is to develop uniform methods that will aid the industry in specifying cooling systems, evaluating bids, performing retrofitting studies, and testing system thermal performance. Current work includes research on once through systems,

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products